Posted in

how to choose welding process for structural parts

When I first started running a welded structural parts shop back in 2008, I’d pull up to job sites and watch guys pick welding processes like they were grabbing a soda from a cooler—no real thought, just whatever they’d used last. Spoiler: half the time that led to parts that cracked mid-assembly or cost way more than they should to fix. Now, 15+ years later, I still get calls from shops panicking because they picked the wrong process for a structural part, and trust me, it’s avoidable. If you’re ordering welded structural parts, or even just figuring out which process to spec for your own project, here’s the no-BS breakdown that works—no jargon, just what we see every day. Welded Structural Parts

First off, let’s get one thing straight: structural parts aren’t some tiny bracket you bolt on a bookshelf. These are the bits that hold bridges up, machinery running, trailer frames towing 10k lbs, or warehouse mezzanines holding pallets. So the process you pick isn’t just about making a weld—it’s about that weld lasting. That means ignoring the flashy social media welding trends (looking at you, those TikTok guys with the fancy laser welds that can’t handle heavy vibration) and sticking to what actually performs for structural loads.

Let’s start with the two most common processes we use, and why we pick one over the other. MIG welding, or Gas Metal Arc Welding (GMAW), is the workhorse here. We use this for 80% of our structural parts, and for good reason. It’s fast—way faster than stick welding, especially for thick steel. If you’re making a trailer frame out of ¼” mild steel tubing, MIG’s your guy. It’s also easier for new welders to learn, so you get less chance of a rookie messing up a critical weld. But here’s the catch: MIG uses a shielding gas, usually a mix of argon and CO2, so it doesn’t work great outdoors if it’s super windy. Wind blows the gas away, and you get porosity—tiny holes in the weld that turn into stress cracks later. We once had a customer try to spec MIG for a structural rail he was welding on a job site with 20mph gusts, and his first batch had to get scrapped. If you’re working outdoors or on parts that need extra penetration, you have to adjust the gas or switch, but more on that.

Then there’s TIG welding, or Gas Tungsten Arc Welding (GTAW). This is the fancy one people think is only for jewelry or thin stainless, but it’s actually solid for structural parts too—especially when precision matters. We use TIG for things like custom crane hoist brackets or parts that need to look clean but also hold 5k lbs. The downside? It’s slow. A TIG welder can lay down half the metal a MIG guy can in the same time, so it’s more expensive if you’re ordering 1000 parts. But if your structural part is going somewhere it can’t have any defects, like inside a food processing machine where a weld spatter could fall into product, TIG is worth the extra cost. Wait, but what about stick welding, you ask? That’s Shielded Metal Arc Welding (SMAW). We don’t use it much for our structural parts anymore, except for repair work on site. Stick’s messy, has more spatter, and the electrodes don’t give as consistent a weld as MIG or TIG. It’s good for rough outdoor work where you don’t have access to shielding gas, but for production structural parts? It’s not our first call.

Next, let’s talk about the stuff that actually drives your choice—no, not what’s cool, what’s your part’s specs. Number one: material thickness. This is non-negotiable. If your structural part is made of 16ga thin steel, TIG’s fine, even maybe MIG with a small wire. But if you’re welding 1” thick steel for a heavy equipment frame? You need a process that can get deep penetration. That’s where flux-cored arc welding (FCAW) comes in—another process we use a lot. Flux-cored uses a self-shielding wire, so no gas needed, and it burns really deep into thick metal. We used FCAW last year for a customer making steel foundation piers that go 10ft into the ground; if we’d tried MIG, we would’ve had to do two passes and risked weak welds. Flux-cored is also better for rusty or dirty metal—another win if you’re working with used structural components that aren’t perfectly cleaned. The only downside is it leaves a slag coat on the weld, so you have to chip it off after, which adds a little time. For mass production, that’s a minor cost, but for small runs, it might not be worth it.

Second big factor: load. This is the structural part, right? So how much weight or stress is it going to take? If it’s a minor support bracket for a bookshelf, you could literally tack it with a torch and call it a day. But if it’s a bracket holding a 500lb forklift counterweight, your weld needs to be 100% strong and crack-resistant. MIG is strong, but if you’re cycling the load over and over (like a trailer bouncing down the highway), TIG or MIG with a higher argon mix is better because it’s more ductile. We once had a customer come to us after their MIG-welded trailer frame cracked after 6 months of use. We tested the weld, found it had too much CO2 in the shielding gas, making it brittle. Switched to a 75% argon mix, re-did the welds, and that frame’s still going 5 years later. Don’t skip load testing spec—we always ask customers upfront what their part’s max load is, because that’s what tells us if we need a process with higher toughness.

Third: production volume. If you’re ordering 1 part, TIG is fine, even if it’s pricey. But if you’re ordering 10,000 identical parts for a construction kit, you can’t pay a TIG welder to work 8 hours a day on that. MIG is the way to go for volume—it’s fast, consistent, and the weld quality stays the same even after thousands of parts. We have a customer who makes garden bed frames and orders 2,000 parts a month; switching from TIG to MIG cut his production time by 60% and his cost per part by 30%, no drop in quality. For medium volume (100-1000 parts), FCAW is a sweet spot—fast enough to keep costs low, strong enough for most structural loads.

Wait, what about other factors that people overlook? Like finish. If your structural part is going to be powder coated, spatter from MIG is easy to grind off, so that’s not a big deal. But if it’s going to be left exposed, like a handrail on a bridge, TIG makes a cleaner, more uniform weld that looks way better. Spatter on exposed parts will rust faster, so that’s a no-brainer. Also, material type. Most structural parts are mild steel, which all these processes work on. But if you’re welding stainless or aluminum? MIG works for both, TIG is better for thin stainless. We don’t do a lot of aluminum structural parts, but when we do, we always tell customers MIG is cheaper, TIG is better for precision.

Let me give you a real example from last quarter to make this concrete. A customer came to us needing 500 structural brackets for a conveyor system. He initially wanted MIG, so we quoted that, but when we asked him about load, he said the brackets hold 800lbs each, and the conveyor runs 24/7, so the load cycles constantly. We suggested MIG with a 90% argon mix to make the weld more ductile, but also showed him a TIG option—wait, no, that would’ve doubled his cost. Instead, we ended up using a pulsed MIG process, which is a variation of regular MIG that controls the heat better, so less spatter and a stronger weld. That ended up being perfect for him—he got the speed of MIG, the strength needed for the load, and didn’t have to pay for TIG. He came back last month for another 1,000 brackets, so that process was the right call.

Another time, a customer tried to save money by using stick welding for a structural steel beam he needed. We told him stick would work for a small number of parts, but for 20 beams, MIG would be cheaper and stronger. He went with stick, and 10 of his beams had to be re-welded because of porosity. Ended up paying more than if he’d just listened to us and picked MIG. That’s the thing about welding processes—choosing the “cheap” one upfront almost always costs more later when parts fail.

Now, let’s talk about mistakes people make all the time. First, thinking more expensive process = better. No, not if you don’t need it. If you’re making a small bracket that only holds 100lbs, TIG is overkill. Second, ignoring environmental factors. Like I said earlier, wind ruins MIG, so if you’re welding outdoors, flux-cored is better. Or if you’re welding in a dirty shop, flux-cored is better than MIG because it doesn’t need clean metal. Third, not working with a supplier who knows their stuff. A lot of big box metal shops will just do whatever process is fastest for them, not what’s best for your part. That’s why we always ask customers to tell us their part’s use case, not just the dimensions—so we can pick the right process.

So what does this all mean for you, whether you’re ordering welded structural parts or spec-ing the process yourself? First, list out three things clearly: material thickness, max load (and if it’s cyclical, like moving parts), and how many parts you need. Then, don’t be afraid to ask your supplier why they’re recommending a certain process. If they just say “MIG is standard,” push a little—ask if there’s a reason it’s good for your part, or if another process would work better. For example, if your part is thick and outdoor, flux-cored is probably better than MIG, and a good supplier will tell you that.

Here’s the other thing: testing. If you’re not sure which process to use, order a test part first. We offer test welds all the time—we’ll make one or two parts with your spec, send them to you, and you can test the strength (or we can do it for you) to make sure it works. I’ve seen too many customers commit to a 1,000 part order only to find out the weld fails, which is a huge waste. A $50 test weld is way cheaper than redoing 1,000 parts.

At the end of the day, choosing a welding process for structural parts isn’t about memorizing acronyms. It’s about matching the process to what your part actually needs to do. I’ve been doing this long enough to spot when a customer is going to have issues because they picked the wrong process, and 9 times out of 10, it’s fixable with a simple swap. If you’re not sure where to start, just reach out—we can walk you through your options, no sales pitch, just what we know works for structural parts.

Sheet Metal Fabrication Parts References

  1. Lincoln Electric. (2021). Welding Processes for Structural Applications. Lincoln Electric Company.
  2. American Welding Society. (2022). Structural Welding Code – Steel (AWS D1.1). American Welding Society.
  3. Hobart Brothers Company. (2020). Flux-Cored vs. MIG Welding for Heavy Structural Fabrication. Illuminating Facts for Fabricators.

Jianhu Yuhua Machinery Manufacturing Co., Ltd.
As one of the most professional welded structural parts manufacturers and suppliers in China, our products have good reputation in the market. Please rest assured to buy durable welded structural parts made in China here from our factory.
Address: No.1 Peiliu South Street, Lugou Town, Jianhu County, Yancheng City, Jiangsu Province, P.R.China
E-mail: 13770213655@163.com
WebSite: https://www.yuhuamfg.com/